Safety information search results
Filter your results
Building or structure type
- (-)
Buildings
(141)
- Agricultural buildings (2)
- Commercial (10)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (2)
- Industrial buildings (4)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (40)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (10)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Car parks (2)
- Flats & apartments (15)
- Freestanding walls (2)
- Hotels & hostels (3)
- Houses (13)
- Retaining structures (4)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (13)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (68)
- Demolition project (3)
- Excavation (4)
- Extension project (7)
- Fire safety assessment (1)
- New build (45)
- Refurbishment (2)
- Remediation project (5)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (9)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (7)
- Basements (7)
- Beams (26)
- Bracing (10)
- Canopies (3)
- Ceilings (7)
- Cladding (12)
- Columns (16)
- Fasteners & connections (34)
- Fences (1)
- Fire exit doors (1)
- Fire protection (6)
- Foundations (4)
- Insulation (3)
- Light gauge steel framing (1)
- Padstones (2)
- Parapets (1)
- Roofs (17)
- Shear walls (1)
- Slabs (11)
- Trusses (2)
- Walls (20)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (4)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (6)
- CROSS-UK Newsletter 51 (6)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK [sub-heading only] (115)
- (-) CROSS Newsletter (141)
- CROSS Safety Report (141)
- News [sub-heading only] (18)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Testing of smoke control systems
A reporter is concerned about the way that smoke control systems in residential buildings are commissioned, installed, tested, and maintained.
10 March 2022
CROSS Safety Report
Report ID: 1099
Region: CROSS-UK
Fire safety risks with lithium-ion batteries
A reporter has raised concerns regarding the increase in the use of lithium-ion batteries, along with their related hazards which currently remain unregulated.
10 March 2022
CROSS Safety Report
Report ID: 1058
Region: CROSS-UK
Basement excavation under a semi-detached house causes collapse
Basement excavation under a semi-detached house causes a collapse.
10 March 2022
CROSS Safety Report
Report ID: 1063
Region: CROSS-UK
Cladding and decking certification
A supplier of materials refuses to provide their potential clients with their products’ Reaction to Fire Class.
10 March 2022
CROSS Safety Report
Report ID: 1095
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK
Change of use to care home
A report has been received relating to the intended change of use of a large building.
6 June 2022
CROSS Safety Report
Report ID: 1078
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.