Safety information search results
Filter your results
Building or structure type
- Buildings
(149)
- Agricultural buildings (2)
- Commercial (19)
- Education, science & art buildings (13)
- Health care (13)
- Higher-risk buildings (6)
- Industrial buildings (6)
- Laboratory buildings (1)
- LPS buildings (2)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (5)
- (-) Residential (151)
- Stadiums (1)
- Tall buildings (12)
- Theatres & other entertainment buildings (3)
- Transport buildings (2)
- Car parks (2)
- Flats & apartments (64)
- Hotels & hostels (13)
- Houses (55)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Building height
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (25)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (61)
- Demolition project (1)
- Excavation (3)
- Extension project (14)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (27)
- Refurbishment (9)
- Remediation project (10)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (4)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (9)
- Balustrades (6)
- Basements (4)
- Beams (21)
- Bracing (5)
- Canopies (2)
- Ceilings (1)
- Cladding (7)
- Columns (10)
- Fasteners & connections (20)
- Fire protection (5)
- Foundations (6)
- Insulation (4)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (4)
- PV panels (1)
- Roofs (15)
- Shear walls (3)
- Slabs (7)
- Trusses (2)
- Wall head restraints (1)
- Walls (30)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (57)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (2)
- CROSS Feature Article (1)
- CROSS Newsletter (41)
- CROSS Safety Report (150)
- News [sub-heading only] (10)
CROSS regions
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Failure of Firefighters lift to operate
The reporter tells of an instance when a Firefighters lift switch, located on the Fire Service Access Level (FSAL) in a multi-storey building failed to operate. After an investigation the switch was found not to have been connected.
20 November 2023
CROSS Safety Report
Report ID: 1232
Region: CROSS-UK
The stack effect and considerations for smoke control
A reporter believes real-world tests demonstrate that existing smoke control systems may not suitably account for typical winter stack effect conditions.
20 November 2023
CROSS Safety Report
Report ID: 1250
Region: CROSS-UK
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Domestic canopy degradation
A front entrance canopy to a domestic dwelling had to be temporarily propped following movement of the canopy.
10 February 2023
CROSS Safety Report
Report ID: 853
Region: CROSS-UK
Do planning applications hinder safety improvements?
A potential issue about the reconstruction of a structurally inadequate external fire escape from a building has been raised with CROSS.
17 November 2022
CROSS Safety Report
Report ID: 1043
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
Fire extinguishers in common areas
A reporter raises a point about the provision of fire extinguishers in the common parts of flats. They go on to say that extinguishers should be provided in some cases, to cover identified risks, but that they are not specified due to cost savings pressures and assessor unawareness.
17 November 2022
CROSS Safety Report
Report ID: 1041
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK