CROSS regions
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Deflection of bridge girder under load
A report was received from a bridge examiner to say outer main girder of a short span railway bridge was moving up to 30mm under load.
1 July 2016
CROSS Safety Report
Report ID: 557
Region: CROSS-UK
Concrete encasement falls from bridge girder
Concerns were raised after sections of concrete from the bottom flange of a single encased girder became detached and fell onto an operational line.
1 July 2016
CROSS Safety Report
Report ID: 559
Region: CROSS-UK
Collapse of old drainage chamber under railway track
Concerns were raised after a hole appeared under a railway track.
1 July 2016
CROSS Safety Report
Report ID: 554
Region: CROSS-UK
Railway tunnel ice strike
A train struck a block of ice, thought at first to have fallen from a tunnel.
1 July 2016
CROSS Safety Report
Report ID: 552
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.