Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (5)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (7)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (4)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (4)
- CROSS Newsletter (5)
- CROSS Safety Report (32)
- News [sub-heading only] (1)
CROSS regions
Potential overcrowding in education premises
A reporter expresses concern about the potential for greater occupancy numbers than planned for in lecture theatres within education premises.
21 August 2023
CROSS Safety Report
Report ID: 1202
Region: CROSS-UK
Fire resisting doors fixed open in hot weather
When visiting a client during a period of unusually hot weather, it was noted that the vast majority of the building’s fire resisting door sets were wedged open in an attempt to increase ventilation and reduce internal temperatures.
21 August 2023
CROSS Safety Report
Report ID: 1162
Region: CROSS-UK
Battery Energy Storage System concerns
A reporter informed CROSS about issues that emerged, and had to be resolved, in the design and management of Battery Energy Storage Systems.
24 May 2023
CROSS Safety Report
Report ID: 1166
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
No worse than existing?
This report discusses the perceived exploitation of a common fire safety argument: the existing condition.
17 February 2023
CROSS Safety Report
Report ID: 1148
Region: CROSS-UK
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Fire spread through balconies
This report highlights that the extensive use of combustible materials in the construction of balconies can result in fire spread over the external wall to an extent which is inadequate for building safety, even buildings less than 18m.
17 November 2022
CROSS Safety Report
Report ID: 1052
Region: CROSS-UK
Toughened glass failures
The number of failures of heat-soaked toughened glass leads to a finding that the glass produced by some processors has not been properly heat-soaked and is therefore much more likely to shatter in use.
17 November 2022
CROSS Safety Report
Report ID: 1135
Region: CROSS-UK
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Fire protection of stair structure
A reporter is concerned about the lack of structural fire protection in a fire escape stair.
10 March 2022
CROSS Safety Report
Report ID: 1028
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.