Safety information search results
Filter your results
Building or structure type
- Bridges (54)
- Buildings
(426)
- Agricultural buildings (8)
- Commercial (38)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (26)
- Health care (10)
- Higher-risk buildings (6)
- Industrial buildings (17)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (13)
- Recreational buildings (9)
- Residential (127)
- Stadiums (4)
- Storage buildings (11)
- Tall buildings (22)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Car parks (16)
- Flats & apartments (49)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (7)
- Houses (45)
- Marine structures (3)
- Masts & towers (18)
- Offshore structures (2)
- Railways (17)
- Reservoirs & dams (2)
- Retaining structures (39)
- Roads (12)
- Sewers (5)
- Temporary structures (41)
- Tunnels (3)
Building height
- 5m or higher, but lower than 11m (14)
- 5m or higher, but lower than 12m (1)
- 11m or higher, but lower than 18m (14)
- 18m or higher, but lower than 30m (11)
- 30m or higher (7)
- CROSS-UK [sub-heading only] (22)
- CROSS-US [sub-heading only] (2)
- Lower than 5m (1)
- Lower than 5m (1)
- Low rise (2-4 stories) (1)
- Single storey (6)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (11)
- Design: quality management (61)
- Design calculations (74)
- Design conceptualisation (24)
- Design detailing (100)
- Design drawings (32)
- Design loads (99)
- Design software (30)
- Dynamics (11)
- Fire safety design (18)
- Resilience (22)
- Robustness (52)
- Structural design (125)
- Sustainability (6)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (39)
- Assessment project [sub-heading only] (17)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (246)
- Demolition project (14)
- Excavation (17)
- Extension project (18)
- Fire safety assessment (2)
- Groundworks project (2)
- Maintenance project (4)
- New build (116)
- Refurbishment (18)
- Remediation project (22)
- Repair project (9)
- Strengthening project (11)
- Structural assessment (26)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (8)
- Balconies (15)
- Balustrades (20)
- Basements (13)
- Beams (80)
- Bracing (22)
- Cables (2)
- Canopies (8)
- Ceilings (24)
- Cladding (32)
- Columns (46)
- Fasteners & connections (156)
- Fences (1)
- Fire exit doors (2)
- Fire protection (14)
- Foundations (39)
- Insulation (9)
- Light gauge steel framing (9)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (1)
- Roofs (64)
- Sandwich panels (3)
- Shear walls (3)
- Signs (5)
- Slabs (56)
- Tendons (1)
- Trusses (9)
- Wall head restraints (3)
- Walls (111)
- Wall ties (12)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (9)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Newsletter (235)
- (-) CROSS Safety Report (699)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (5)
CROSS regions
Stress fracture on temporary compact stairs
A stress fracture to a temporary access compact stair unit was identified on site by a scaffold manager.
19 March 2023
CROSS Safety Report
Report ID: 805
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Glued on stainless steel panels fall
A ceiling in a retail setting was designed to be faced with reflective finish panels. The contractor proposed stainless steel bonded to MDF with folded edges and concealed mechanical restraint. The designer overruled the contractor and selected an adhesive-only solution which was implemented. Some months later, several panels failed, with some stainless steel facings falling to the floor.
20 February 2023
CROSS Safety Report
Report ID: 1187
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Frustration about getting a response to a public safety concern
A member of the public reported a partially collapsed retaining structure to bodies they believed could be the responsible authority. Despite continued efforts to get attention to the issue, there was no apparent action to address the concern. This raised the reporter’s concern for public safety.
20 February 2023
CROSS Safety Report
Report ID: 1154
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
The potential for expertise asymmetry in aspects of the design of tall buildings in the UK
A reporter is concerned about the potential for 'expertise asymmetry' in the fire safety domain, with a focus on smoke control systems.
20 February 2023
CROSS Safety Report
Report ID: 1143
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.