Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (4)
- CROSS Newsletter (4)
- CROSS Safety Alert (1)
- CROSS Safety Report (12)
- CROSS Topic Paper (1)
- News [sub-heading only] (2)
- Third party content (1)
- Third party content (1)
CROSS regions
Fire protection to car park steel frame
A reporter is concerned about the fire protection of a steel framed car park above a retail unit.
26 August 2022
CROSS Safety Report
Report ID: 1007
Region: CROSS-UK
Professional indemnity insurance issues raise safety concerns
Several reporters have raised concerns in relation to significant cost increases and the introduction of new restrictions on professional indemnity insurance (PII) policies.
13 August 2021
CROSS Safety Report
Report ID: 1022
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Structural fire safety when responding to the climate emergency
Luke Bisby urges structural engineers to improve their understanding of ‘fire resistance’ as the profession looks to innovate rapidly in response to climate change.
1 February 2021
Third party content
Publisher: The Institution of Structural Engineers
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
Light gauge steel fabrication
Referring to Report AUS-4, Light steel truss issues, this reporter has concerns about the low ductility of the high tensile steel, in particular with respect to connection design and capacity.
1 August 2020
CROSS Safety Report
Report ID: 957
Region: CROSS-AUS
GFRP reinforcement in concrete structures
A correspondent has become aware of work being undertaken in the field of glass fibre reinforced polymer (GFRP) reinforcement as a substitute for steel rebar in concrete structures and is deeply concerned by what they have observed.
1 August 2020
CROSS Safety Report
Report ID: 939
Region: CROSS-AUS
Glazing design and horizontal barrier loading
A reporter shares problems they have encountered with barrier loading requirements on a curtain walling glazing system.
1 July 2020
CROSS Safety Report
Report ID: 899
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.