Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.