Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- BIM (1)
- Computational design (2)
- Design: quality management (7)
- Design calculations (7)
- Design conceptualisation (2)
- Design detailing (10)
- Design drawings (5)
- Design loads (17)
- Design software (3)
- Dynamics (3)
- Fire safety design (5)
- Resilience (1)
- Robustness (3)
- Structural design (21)
- Sustainability (3)
Fire incident response
Method of construction
Structural form
Elements & systems
- Balconies (1)
- Balustrades (2)
- Beams (5)
- Cables (1)
- Canopies (1)
- Ceilings (2)
- Cladding (2)
- Columns (5)
- Fasteners & connections (11)
- Fire protection (2)
- Foundations (2)
- Light gauge steel framing (4)
- Parapets (1)
- PV panels (2)
- Roofs (8)
- Sandwich panels (1)
- Signs (2)
- Slabs (8)
- Trusses (1)
- Walls (9)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (17)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK [sub-heading only] (1)
- CROSS Safety Alert (22)
- CROSS Safety Report (45)
- CROSS Theme Page (2)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (4)
- Third party content (6)
- Third party content (2)
CROSS regions
Explosive demolition of structures
John Wolstenholme shares his insights on the use of Relevant Good Practice for the explosive demolition of structures, and the expectations to be demonstrated in the concept, design, methodology and safe undertaking of an explosive demolition project.
11 December 2023
Third party content
Installation of epoxy resin adhesive for reinforcing bar anchors
Potentially dangerous installation of resin-anchored reinforcing bars, where epoxy resin was applied at the top of the hole after bars had been inserted.
7 November 2023
CROSS Safety Report
Report ID: 1225
Region: CROSS-AUS
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Incorrect use of software for wind loads on solar panels
A reporter is concerned about designers relying completely on the output of software for structural analysis when they do not fully understand the requirements for data input.
7 November 2023
CROSS Safety Report
Report ID: 1212
Region: CROSS-AUS
Underpinning using screw piles
A reporter is concerned that inclined screw piles used for underpinning may be subjected to significant bending moments that compromise their capacity.
7 November 2023
CROSS Safety Report
Report ID: 1175
Region: CROSS-AUS
Case Studies on Failure Investigations In Structural and Geotechnical Engineering
A monograph presenting case studies on failure investigations in structural and geotechnical engineering in three sections
26 September 2023
Third party content
Publisher: International Association for Bridge and Structural Engineering
Structural safety of reinforced autoclaved aerated concrete (RAAC) planks
A Theme Page to raise awareness of and encourage knowledge sharing on the structural safety of RAAC planks.
CROSS Theme Page
Region: CROSS-UK, CROSS-AUS, CROSS-US
The misuse of standard details and notes on structural drawings
This report draws attention to the excessive and incorrect use of standard details and notes on structural drawings, as well as the assumption that the builder/contractor will somehow work out the designer's intention of these on site. Inadequate or conflicting design and documentation can potentially lead to failures.
30 March 2023
CROSS Safety Report
Report ID: 1133
Region: CROSS-AUS
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.