Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Inadequate storage of glazing panels
A reporter raises concerns about how glazing panels are being stored on sites. They have witnessed scenarios where panels are not being individually tied back to storage frames or to a secure place.
1 April 2016
CROSS Safety Report
Report ID: 532
Region: CROSS-UK
Installation of PV panels
A reporter's firm believes an oversaturated market of engineers carrying out assessments has drove the prices for assessments on roof structures accommodating PV panels down.
1 April 2016
CROSS Safety Report
Report ID: 533
Region: CROSS-UK
Sudden hole in piling mat
A reporter describes how a 450mm diameter hole appeared in a piling mat whilst digging a trench that was 0.5m away.
1 April 2016
CROSS Safety Report
Report ID: 566
Region: CROSS-UK
Falling lath and plaster ceiling
A 100 year old lath and plaster ceiling in a shop unit collapsed in part, injuring the shop keeper.
1 April 2016
CROSS Safety Report
Report ID: 562
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Importance of bearings
A reporter is concerned that the long-term characteristics and behaviour of bearings are often underestimated.
1 April 2016
CROSS Safety Report
Report ID: 387
Region: CROSS-UK
Issues with lifting large glazing unit
Inadequate instructions were provided by a glazing pane supplier on how to lift and move their product off of a truck and onto the works.
1 April 2016
CROSS Safety Report
Report ID: 176
Region: CROSS-UK
PV panels blown off roof
Concerns are raised about the adequacy of fixings for PV panels after panels were blown off of a flat roof.
1 October 2015
CROSS Safety Report
Report ID: 519
Region: CROSS-UK
PV panels on domestic roof
A reporter raises concerns as they suspect PV panels are being erected on domestic (and commercial) roofs across the UK without adequate engineering analysis and design.
1 October 2015
CROSS Safety Report
Report ID: 528
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.