Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (8)
- CROSS Safety Report (15)
CROSS regions
Temporary bridge jacking
Transport for London (London Rail) reported publically on an incident concerning temporary bridge jacking and permission to reproduce an extract is gratefully acknowledged by CROSS.
1 April 2009
CROSS Safety Report
Report ID: 142
Region: CROSS-UK
Brick bridge collapse
A historic bridge collapsed minutes after workers fled to safety.
1 October 2008
CROSS Safety Report
Report ID: 138
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Failure of pile load test arrangement
A pile was being load-tested, for confirmation of design pile loads for the foundations of a road bridge, when the web of the deep steel beam used in the testing arrangement buckled.
1 January 2015
CROSS Safety Report
Report ID: 484
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.