Safety information search results
Filter your results
Building or structure type
- Buildings
(23)
- Agricultural buildings (1)
- Commercial (8)
- Education, science & art buildings (7)
- Health care (6)
- (-) Industrial buildings (23)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (1)
- Residential (6)
- Stadiums (1)
- Storage buildings (1)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Railways (1)
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (4)
- CROSS Safety Report (23)
- News [sub-heading only] (1)
CROSS regions
Provision of water for firefighting
A reporter suggests that there is inadequate guidance on firefighting water provision for more complex and larger buildings.
20 November 2023
CROSS Safety Report
Report ID: 1204
Region: CROSS-UK
Fire resisting doors fixed open in hot weather
When visiting a client during a period of unusually hot weather, it was noted that the vast majority of the building’s fire resisting door sets were wedged open in an attempt to increase ventilation and reduce internal temperatures.
21 August 2023
CROSS Safety Report
Report ID: 1162
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Battery Energy Storage System concerns
A reporter informed CROSS about issues that emerged, and had to be resolved, in the design and management of Battery Energy Storage Systems.
24 May 2023
CROSS Safety Report
Report ID: 1166
Region: CROSS-UK
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Snow drift implications due to building extension
Part of a roof collapsed in a factory and warehouse facility shortly after a storm event due to snow drift loads.
13 December 2022
CROSS Safety Report
Report ID: 947
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Construction products- fire test certificates
A reporter has notified CROSS-AUS regarding the potentially inappropriate use of regulatory/compliance fire test methods on certain products. This has led, they say, to the circulation of inaccurate test certificates in the market and possibly the use of these products on buildings where they may not be suitable.
2 August 2022
CROSS Safety Report
Report ID: 1060
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.