Safety information search results
Filter your results
Building or structure type
- Buildings
(141)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (16)
- Education, science & art buildings (11)
- Health care (11)
- Higher-risk buildings (6)
- Industrial buildings (5)
- Laboratory buildings (1)
- LPS buildings (2)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (4)
- (-) Residential (143)
- Stadiums (1)
- Tall buildings (12)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (25)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (58)
- Demolition project (1)
- Excavation (3)
- Extension project (14)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (27)
- Refurbishment (9)
- Remediation project (9)
- Repair project (3)
- Strengthening project (2)
- Structural assessment (4)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (9)
- Balustrades (6)
- Basements (4)
- Beams (21)
- Bracing (5)
- Canopies (2)
- Ceilings (1)
- Cladding (7)
- Columns (9)
- Fasteners & connections (18)
- Fire protection (5)
- Foundations (2)
- Insulation (4)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (4)
- PV panels (1)
- Roofs (15)
- Shear walls (1)
- Slabs (6)
- Trusses (2)
- Wall head restraints (1)
- Walls (30)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (57)
- CROSS Feature Article (1)
- CROSS Newsletter (41)
- CROSS Safety Report (142)
- News [sub-heading only] (10)
CROSS regions
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Serious inconsistencies when installing passive fire protection
An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.
20 November 2023
CROSS Safety Report
Report ID: 1199
Region: CROSS-UK
Inadequate fire stopping around cables and other penetrations
A reporter observed inadequate fire stopping due to both ineffective installation or damage caused by follow on trades.
21 August 2023
CROSS Safety Report
Report ID: 1201
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Provision of water for firefighting
A reporter suggests that there is inadequate guidance on firefighting water provision for more complex and larger buildings.
20 November 2023
CROSS Safety Report
Report ID: 1204
Region: CROSS-UK
Combustible cladding material ignited during remediation work
Damage to combustible insulation on the external walls of a high rise residential premises was noticed from apparent combustion within the EPS element.
21 August 2023
CROSS Safety Report
Report ID: 1222
Region: CROSS-UK
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Failure of Firefighters lift to operate
The reporter tells of an instance when a Firefighters lift switch, located on the Fire Service Access Level (FSAL) in a multi-storey building failed to operate. After an investigation the switch was found not to have been connected.
20 November 2023
CROSS Safety Report
Report ID: 1232
Region: CROSS-UK
The stack effect and considerations for smoke control
A reporter believes real-world tests demonstrate that existing smoke control systems may not suitably account for typical winter stack effect conditions.
20 November 2023
CROSS Safety Report
Report ID: 1250
Region: CROSS-UK
Domestic canopy degradation
A front entrance canopy to a domestic dwelling had to be temporarily propped following movement of the canopy.
10 February 2023
CROSS Safety Report
Report ID: 853
Region: CROSS-UK