Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (7)
- Excavation (1)
- Extension project (1)
- Groundworks project (1)
- New build (4)
- Refurbishment (2)
- Strengthening project (2)
- Structural assessment (1)
Construction period
Method of construction
Structural form
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (8)
- CROSS Safety Report (17)
- News [sub-heading only] (1)
CROSS regions
Stunts on bridges cause concern
A thrill-seeker travelling up and over the arch of a bridge, risking serious injury to themselves and others, raises the concerns of a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1136
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Remoteness of contact and lack of supervision
A correspondent has been thinking about the problem of lack of supervision in construction generally and has come to the conclusion that this is all part of a wider problem.
1 January 2019
CROSS Safety Report
Report ID: 684
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Split responsibility for collapsed boundary wall adjacent to railway
A train driver reported striking debris from a collapsed wall in an urban location.
1 July 2018
CROSS Safety Report
Report ID: 776
Region: CROSS-UK
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK