Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Split responsibility for collapsed boundary wall adjacent to railway
A train driver reported striking debris from a collapsed wall in an urban location.
1 July 2018
CROSS Safety Report
Report ID: 776
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK