Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (7)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
Potentially unsafe buckling resistance checks using software
A number of anomalies were detected in the outputs from a proprietary structural steelwork design program.
6 June 2022
CROSS Safety Report
Report ID: 1075
Region: CROSS-UK
Crane outrigger loads underestimated due to misuse of software
A reporter is concerned about how the misuse of software can lead to incorrect outrigger loads being used in the design of foundations for crane outriggers.
1 April 2020
CROSS Safety Report
Report ID: 915
Region: CROSS-UK
Set up of temporary works
This report highlights the importance of following correct procedures when installing temporary works.
1 July 2019
CROSS Safety Report
Report ID: 797
Region: CROSS-AUS
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Scaffold support overturns
A 5m high support scaffold screened with fabric overturned when airflow was introduced to a building.
1 January 2017
CROSS Safety Report
Report ID: 575
Region: CROSS-UK
Failure of supposedly grade 10.9 bolts
There was a high potential for collapse when supposedly grade 10.9 high strength holding bolts failed on a crane base.
1 October 2016
CROSS Safety Report
Report ID: 585
Region: CROSS-UK
Injuries from falling scaffold tube
Two children received injuries when a scaffold tube fell from height.
1 July 2016
CROSS Safety Report
Report ID: 571
Region: CROSS-UK
Sudden hole in piling mat
A reporter describes how a 450mm diameter hole appeared in a piling mat whilst digging a trench that was 0.5m away.
1 April 2016
CROSS Safety Report
Report ID: 566
Region: CROSS-UK
Mobile scaffold tower falls 7 storeys
A mobile tower, which was not being used, toppled over the guardrail and fell 7 storeys (27m) to the ground.
1 April 2014
CROSS Safety Report
Report ID: 436
Region: CROSS-UK