Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (11)
- Extension project (3)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (5)
- Refurbishment (2)
- Remediation project (1)
- Repair project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Feature Article (1)
- CROSS Newsletter (7)
- CROSS Safety Alert (4)
- CROSS Safety Report (20)
- CROSS Topic Paper (1)
- News [sub-heading only] (7)
CROSS regions
Loading on balconies
A reporter wrote on behalf of a professional committee to draw attention to a concern about part of a conversion project that had come to their attention.
1 July 2007
CROSS Safety Report
Report ID: 52
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Assessment and inspection of buildings
SCOSS has been concerned for some time (2003) at the potential for deterioration of buildings and other facilities during their working lives such that there results an inadequate reserve of strength against collapse of the whole or part of the structure.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Building a safer future - summary of final report
This Alert is a summary of selected parts of the Independent Review of Building Regulations and Fire Safety: Final Report that are relevant to structural and civil engineers.
1 July 2018
CROSS Safety Alert
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Safe use of lifting magnets
A reporter highlights how a two-tonne lift using magnetic lifting equipment was abandoned, averting a potential high consequence event.
1 October 2019
CROSS Safety Report
Report ID: 849
Region: CROSS-UK