Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- (-) CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (11)
- CROSS Safety Report (19)
- News [sub-heading only] (4)
CROSS regions
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Do current regulations apply when repairing older buildings?
A 19th century three story mill was subject to a fire which resulted in the sudden collapse of part of the interior structure.
1 October 2010
CROSS Safety Report
Report ID: 212
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.