Safety information search results
Filter your results
Building or structure type
- Bridges (24)
- Buildings
(205)
- Car parks (6)
- Commercial (16)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Health care (2)
- Industrial buildings (3)
- LPS buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (54)
- Stadiums (3)
- Storage buildings (3)
- Tall buildings (6)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Masts & towers (12)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (6)
- Sewers (3)
- Temporary structures (24)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (1)
- Design: quality management (21)
- Design calculations (22)
- Design conceptualisation (8)
- Design detailing (56)
- Design drawings (21)
- Design loads (41)
- Design software (6)
- Dynamics (4)
- Fire safety design (7)
- Resilience (5)
- Robustness (20)
- Structural design (50)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (20)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (155)
- Demolition project (9)
- Excavation (15)
- Extension project (7)
- Groundworks project (3)
- Maintenance project (2)
- New build (84)
- Refurbishment (7)
- Remediation project (6)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (1)
- Balconies (6)
- Balustrades (7)
- Basements (7)
- Beams (50)
- Bracing (12)
- Cables (2)
- Canopies (1)
- Ceilings (17)
- Cladding (21)
- Columns (25)
- Fasteners & connections (108)
- Fire protection (5)
- Foundations (29)
- Insulation (2)
- Light gauge steel framing (6)
- Lintels (2)
- Padstones (5)
- Parapets (5)
- PV panels (2)
- Roofs (26)
- Shear walls (2)
- Signs (3)
- Slabs (29)
- Tendons (1)
- Trusses (5)
- Wall head restraints (3)
- Walls (65)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (4)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (11)
- CROSS-UK Newsletter 1 (7)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (6)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (4)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (5)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (218)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (9)
- CROSS Newsletter (118)
- CROSS Safety Alert (11)
- CROSS Safety Report (339)
- CROSS Topic Paper (8)
- News [sub-heading only] (40)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Remoteness of contact and lack of supervision
A correspondent has been thinking about the problem of lack of supervision in construction generally and has come to the conclusion that this is all part of a wider problem.
1 January 2019
CROSS Safety Report
Report ID: 684
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Collapse of lifting tackle connected by threaded bar
A reporter describes how a set of 3t chain blocks and a 1m length of 20mm diameter threaded bar failed and fell from a height of 5m.
1 October 2018
CROSS Safety Report
Report ID: 692
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK
Steel fabricators substituting S275/S355 steel for S235 steel
A reporter has been asked many times by fabricators if they can use grade S235 steel in lieu of S275 or S355.
1 January 2019
CROSS Safety Report
Report ID: 758
Region: CROSS-UK
Major UK steel manufacturer talks about steel substitution
A correspondent is concerned that cold formed S235 steel is being used in place of hot formed S355 steel, as this can have dangerous implications.
1 January 2019
CROSS Safety Report
Report ID: 761
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Widespread fire safety failings in residential blocks
A reporter highlights fire safety issues that were found during investigations of building defects in residential blocks.
1 January 2018
CROSS Safety Report
Report ID: 706
Region: CROSS-UK
Designed scaffold built incorrectly
A Temporary Works Coordinator (TWC) found that scaffolding was not constructed in accordance with the approved design drawings and a number of unauthorised modifications had been made.
1 January 2018
CROSS Safety Report
Report ID: 701
Region: CROSS-UK