Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK [sub-heading only] (17)
- (-) CROSS Newsletter (17)
- (-) CROSS Safety Report (17)
- News [sub-heading only] (2)
CROSS regions
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Street sign collapse causes fatality
This report highlights the potential dangers of street signs on fixed vertical supports subject to wind loading.
1 October 2018
CROSS Safety Report
Report ID: 793
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
Estuary bridge - failure of stainless steel tie bars
Concerns were raised after a principal inspection of a bridge found that numerous tie bars connecting the original bridge to strengthened footways had failed.
1 October 2015
CROSS Safety Report
Report ID: 522
Region: CROSS-UK
Rotting of rafters likely due to spray foam insulation
Rafters had rotted in areas to 40-50% of their original depth due to spray foam insulation having been installed some years previously, says a reporter.
1 July 2015
CROSS Safety Report
Report ID: 503
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Failure of high strength studs
A reporter raises concerns after several M12 threaded studs snapped not long after installation.
1 April 2015
CROSS Safety Report
Report ID: 499
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.