Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (10)
- (-) CROSS Newsletter (13)
- CROSS Safety Report (13)
- News [sub-heading only] (4)
CROSS regions
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Use of water filled containers to anchor temporary structures
The reporter who is a local authority Environmental Health Officer raises concerns over the use of water filled plastic containers being used as anchors/ballast at festivals.
1 July 2011
CROSS Safety Report
Report ID: 255
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Sudden hole in piling mat
A reporter describes how a 450mm diameter hole appeared in a piling mat whilst digging a trench that was 0.5m away.
1 April 2016
CROSS Safety Report
Report ID: 566
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Failure of supposedly grade 10.9 bolts
There was a high potential for collapse when supposedly grade 10.9 high strength holding bolts failed on a crane base.
1 October 2016
CROSS Safety Report
Report ID: 585
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Concerns over unreinforced lighting column foundation
Concerns were raised on a major highway project after it was noticed that the contractor was casting a pad foundation with no reinforcement in the base.
1 July 2017
CROSS Safety Report
Report ID: 652
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.