Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(131)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (10)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (4)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (34)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Freestanding walls (3)
- Masts & towers (7)
- Railways (8)
- Retaining structures (13)
- Roads (5)
- Sewers (1)
- Temporary structures (15)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (13)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (99)
- Demolition project (6)
- Excavation (10)
- Extension project (9)
- Groundworks project (1)
- New build (56)
- Refurbishment (2)
- Remediation project (8)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (9)
Method of construction
Elements & systems
- Arch (4)
- Balconies (7)
- Balustrades (10)
- Basements (7)
- Beams (38)
- Bracing (13)
- Cables (1)
- Canopies (3)
- Ceilings (7)
- Cladding (9)
- Columns (21)
- Fasteners & connections (51)
- Fences (1)
- Fire protection (3)
- Foundations (13)
- Insulation (2)
- Light gauge steel framing (2)
- Padstones (2)
- Parapets (2)
- Roofs (17)
- Shear walls (1)
- Signs (1)
- Slabs (16)
- Trusses (2)
- Walls (30)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (6)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK [sub-heading only] (194)
- (-) CROSS Newsletter (224)
- CROSS Safety Report (224)
- News [sub-heading only] (26)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Fire protection of stair structure
A reporter is concerned about the lack of structural fire protection in a fire escape stair.
10 March 2022
CROSS Safety Report
Report ID: 1028
Region: CROSS-UK
Basement excavation under a semi-detached house causes collapse
Basement excavation under a semi-detached house causes a collapse.
10 March 2022
CROSS Safety Report
Report ID: 1063
Region: CROSS-UK
Specification issue with steel hollow sections
A reporter raises concerns after their structural engineer had failed to specify the steel grade used in the design for hollow sections on two projects.
30 July 2021
CROSS Safety Report
Report ID: 1006
Region: CROSS-UK
Major safety defects in hospital
A number of construction defects were found in a hospital following the inspection of the external wall system.
29 March 2021
CROSS Safety Report
Report ID: 826
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.