Safety information search results
Filter your results
Building or structure type
- Bridges (22)
- Buildings
(231)
- Agricultural buildings (8)
- Car parks (7)
- Commercial (19)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (13)
- Higher-risk buildings (3)
- Industrial buildings (9)
- LPS buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (57)
- Stadiums (1)
- Storage buildings (7)
- Tall buildings (14)
- Theatres & other entertainment buildings (7)
- Transport buildings (1)
- Buried pipes & culverts (3)
- Freestanding walls (2)
- Marine structures (1)
- Masts & towers (9)
- Offshore structures (2)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (9)
- Sewers (3)
- Temporary structures (24)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (42)
- Design calculations (45)
- Design conceptualisation (1)
- Design detailing (55)
- Design drawings (14)
- Design loads (67)
- Design software (18)
- Dynamics (6)
- Fire safety design (7)
- Resilience (18)
- Robustness (35)
- Structural design (72)
- Sustainability (4)
Fire incident response
Project type
- Alteration & conversion project (23)
- Assessment project [sub-heading only] (9)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (154)
- Demolition project (11)
- Excavation (12)
- Extension project (11)
- Fire safety assessment (2)
- Groundworks project (1)
- Maintenance project (1)
- New build (70)
- Refurbishment (4)
- Remediation project (11)
- Repair project (5)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (5)
- Balconies (9)
- Balustrades (14)
- Basements (7)
- Beams (50)
- Bracing (18)
- Canopies (5)
- Ceilings (19)
- Cladding (17)
- Columns (29)
- Fasteners & connections (96)
- Fire exit doors (1)
- Fire protection (7)
- Foundations (17)
- Insulation (6)
- Light gauge steel framing (2)
- Lintels (3)
- Padstones (3)
- Parapets (7)
- Roofs (37)
- Sandwich panels (1)
- Shear walls (1)
- Signs (3)
- Slabs (28)
- Tendons (1)
- Trusses (4)
- Walls (65)
- Wall ties (7)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (14)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (7)
- CROSS-UK Newsletter 13 (5)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (8)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (7)
- CROSS-UK Newsletter 39 (7)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (6)
- CROSS-UK Newsletter 43 (6)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (8)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (391)
- CROSS Newsletter (198)
- (-) CROSS Safety Report (391)
- News [sub-heading only] (73)
CROSS regions
Masonry support prop adaptor
A reporter has written to say that when carrying out temporary needling and propping of openings formed in masonry walls one of the most important aspects is to ensure that the props are concentrically loaded and plumb.
1 July 2006
CROSS Safety Report
Report ID: 32
Region: CROSS-UK
Building regulations checking
A reporter’s firm has been carrying out building regulations checks for 25 years, but it is only in the last six or seven years (say 2000-2006) that concerns have arisen, some of which are described below.
1 July 2007
CROSS Safety Report
Report ID: 33
Region: CROSS-UK
Unprotected deep excavation
On a construction site by a busy main road a reporter saw a deep excavation with no internal temporary works.
1 November 2005
CROSS Safety Report
Report ID: 16
Region: CROSS-UK
Design of timber structures
An approximate design led to a timber roof deflecting considerably.
1 November 2005
CROSS Safety Report
Report ID: 17
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Possible galvanising concern
A reporter has a question about using galvanised steel poles for the members of dome structures.
1 November 2006
CROSS Safety Report
Report ID: 48
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Responsibility for change
The inadequate substitution of lintels led to them buckling, and the surrounding masonry cracking.
1 February 2007
CROSS Safety Report
Report ID: 50
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.