Safety information search results
Filter your results
Building or structure type
- Bridges (59)
- Buildings
(482)
- Agricultural buildings (8)
- Car parks (16)
- Commercial (48)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (37)
- Health care (16)
- Higher-risk buildings (6)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (150)
- Stadiums (4)
- Storage buildings (11)
- Tall buildings (22)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (40)
- Roads (12)
- Sewers (5)
- Temporary structures (41)
- Tunnels (3)
Building height
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (66)
- Design calculations (80)
- Design conceptualisation (29)
- Design detailing (111)
- Design drawings (36)
- Design loads (106)
- Design software (34)
- Dynamics (12)
- Fire safety design (18)
- Resilience (24)
- Robustness (58)
- Structural design (135)
- Sustainability (6)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (20)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (262)
- Demolition project (14)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (2)
- Maintenance project (5)
- New build (119)
- Refurbishment (21)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (29)
- Underpinning project (4)
Construction period
Method of construction
Elements & systems
- Arch (8)
- Balconies (16)
- Balustrades (23)
- Basements (13)
- Beams (85)
- Bracing (23)
- Cables (3)
- Canopies (8)
- Ceilings (24)
- Cladding (40)
- Columns (50)
- Fasteners & connections (172)
- Fences (1)
- Fire exit doors (2)
- Fire protection (14)
- Foundations (43)
- Insulation (10)
- Light gauge steel framing (11)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (3)
- Roofs (74)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (114)
- Wall ties (13)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(53)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (16)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (9)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Newsletter (235)
- (-) CROSS Safety Report (768)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (5)
CROSS regions
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Combustible cladding material ignited during remediation work
Damage to combustible insulation on the external walls of a high rise residential premises was noticed from apparent combustion within the EPS element.
21 August 2023
CROSS Safety Report
Report ID: 1222
Region: CROSS-UK
Potential overcrowding in education premises
A reporter expresses concern about the potential for greater occupancy numbers than planned for in lecture theatres within education premises.
21 August 2023
CROSS Safety Report
Report ID: 1202
Region: CROSS-UK
Inadequate fire stopping around cables and other penetrations
A reporter observed inadequate fire stopping due to both ineffective installation or damage caused by follow on trades.
21 August 2023
CROSS Safety Report
Report ID: 1201
Region: CROSS-UK
Fire safety management during building works
A reporter shares multiple and various concerns about the maintenance of existing fire safety measures during a period of building work, as well as the approach taken to manage building evacuation for persons with reduced mobility (PRM).
21 August 2023
CROSS Safety Report
Report ID: 1193
Region: CROSS-UK
Fire resisting doors fixed open in hot weather
When visiting a client during a period of unusually hot weather, it was noted that the vast majority of the building’s fire resisting door sets were wedged open in an attempt to increase ventilation and reduce internal temperatures.
21 August 2023
CROSS Safety Report
Report ID: 1162
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Checking structural calculations
A reporter worked for a small consultancy as a graduate structural engineer where their calculations were never checked.
3 August 2023
CROSS Safety Report
Report ID: 816
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK