Safety information search results
Filter your results
Safety area
Building height
Materials
Products
Project or lifecycle stage
Construction
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
CROSS regions
Reflective thinking
Reflective thinking is a constant drive to ask questions and to make appropriate responses to them. It is characterised by a healthy scepticism about all inputs to processes, about the processes themselves and about the outcomes from processes.
1 December 2016
CROSS Topic Paper
Region: CROSS-UK
Structures at the end of their design life
Design life varies according to the type and use of a structure. A structure should retain fitness for purpose as it approaches and passes its design life or changes use.
1 June 2015
CROSS Topic Paper
Region: CROSS-UK
Timber framed buildings in fire situations - the role of the designer - update
This is an update of an earlier paper because there had been a number of severe fires in timber framed buildings during construction.
1 March 2015
CROSS Topic Paper
Region: CROSS-UK
Elliot Lake mall collapse
In June 2012 part of the roof of a thirty two year old Mall in Ontario, Canada collapsed killing two people and injuring nineteen.
1 December 2014
CROSS Topic Paper
Region: CROSS-UK
FC Twente stadium roof collapse
This paper concerns the collapse at the FC Twente Stadium in Holland in 2011 when part of a cantilever steel frame roof failed during erection.
1 July 2014
CROSS Topic Paper
Region: CROSS-UK
Timber framed buildings in fire situations - the role of the designer
This 2010 paper was updated in 2014 and the newer version should be used for reference.
1 November 2010
CROSS Topic Paper
Region: CROSS-UK
Assessment and inspection of buildings
SCOSS has been concerned for some time (2003) at the potential for deterioration of buildings and other facilities during their working lives such that there results an inadequate reserve of strength against collapse of the whole or part of the structure.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
Assumptions behind the Eurocodes
This was published in 2009 and has to be read in that context. The main issues however are universally valid.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
The education base - safety related issues
This note is a contribution to the IStructE’s debate on the teaching of structural engineering at undergraduate level, for the general information of ICE and HSE, and for wider debate.
1 September 2010
CROSS Topic Paper
Region: CROSS-UK
Falsework - full circle?
The late 1960s and early 1970s was a time of great activity and innovation in the construction industry. Boundaries were being pushed out in all directions - in respect of design, materials and scale of projects which brought about some great achievements, but also a number of serious repercussions.
1 August 2010
CROSS Topic Paper
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.