Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
CROSS regions
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Mandatory seismic retrofit construction with quality control problems
Standard seismic retrofit details were used for a building with a non-standard foundation, resulting in inadequate connection of structural shear walls to foundations.
1 September 2020
CROSS Safety Report
Report ID: 888
Region: CROSS-US
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Inadequate design and quality assurance on a mandatory seismic retrofit project
A tenant's structural engineer discovers widespread design and related quality problems on a mandatory seismic retrofit project.
1 September 2020
CROSS Safety Report
Report ID: 986
Region: CROSS-US
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.