Inadequate design submissions for alterations to an existing building
An upper storey extension was designed without considering the effect on the structure below.
10 March 2022
CROSS Safety Report
Report ID: 1085
Region: CROSS-UK
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Structural assessments of multi-storey car parks
The parking industry has in recent years (2012) seen several MSCPs closed due to structural fears, says a reporter, which begs the question how close were they to structural failure before they were taken out of service?
1 April 2012
CROSS Safety Report
Report ID: 224
Region: CROSS-UK
Collapse of Large Panel System (LPS) buildings during demolition
In 2009, numerous progressive and unexpected collapses occurred during the demolition of Large Panel System (LPS) tower blocks.
1 April 2010
CROSS Safety Report
Report ID: 186
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.