Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (45)
- Demolition project (1)
- Excavation (2)
- Extension project (6)
- New build (30)
- Refurbishment (4)
- Remediation project (6)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (2)
Method of construction
Elements & systems
- Balconies (1)
- Balustrades (1)
- Basements (2)
- (-) Beams (86)
- Bracing (6)
- Cables (1)
- Ceilings (1)
- Cladding (1)
- Columns (17)
- Fasteners & connections (23)
- Fire protection (1)
- Foundations (4)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (5)
- Parapets (1)
- Roofs (6)
- Slabs (13)
- Tendons (1)
- Trusses (1)
- Walls (10)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (5)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (50)
- CROSS Newsletter (38)
- CROSS Safety Alert (1)
- CROSS Safety Report (85)
- News [sub-heading only] (10)
CROSS regions
Incorrect scaffold installation
A reporter describes how the Temporary Works Coordinator observed that tension connections on standards for a scaffold system were either omitted or had incorrect pins/bolts used.
1 January 2018
CROSS Safety Report
Report ID: 700
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Unconnected steel beam connection
A reporter describes how they came across a completely inadequate steel connection while attending site for another matter.
1 October 2017
CROSS Safety Report
Report ID: 646
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Concrete encasement falls from bridge girder
Concerns were raised after sections of concrete from the bottom flange of a single encased girder became detached and fell onto an operational line.
1 July 2016
CROSS Safety Report
Report ID: 559
Region: CROSS-UK