Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (5)
- CROSS Safety Report (18)
CROSS regions
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
Demolition risks
This report is about the collapse of a flat slab building that occurred overseas whilst the top floor of the building was being demolished onto the next floor down.
1 January 2008
CROSS Safety Report
Report ID: 96
Region: CROSS-UK
Further demolition collapse
This report is of an incident that occurred recently in a UK city when a floor suffered a structural collapse during the demolition of a reinforced concrete building.
1 January 2008
CROSS Safety Report
Report ID: 90
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Safety issues with composite metal deck floors
A contractor had a near miss when pouring a concrete slab with permanent formwork.
1 January 2012
CROSS Safety Report
Report ID: 288
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
Permanent formwork to slabs
Concerns are raised over deflection issues that are not being considered when using permanent formwork.
1 January 2011
CROSS Safety Report
Report ID: 215
Region: CROSS-UK
Risks from off-site manufacture and hybrid construction
A reporter was recently investigating a ‘near miss’ involving concrete construction in which pre-cast and in-situ concrete were used in combination.
1 January 2016
CROSS Safety Report
Report ID: 529
Region: CROSS-UK
Plastic spacers in slabs
A reporter has spotted plastic rails about 1.5 m long being used to support the bottom rebar mat of a slab.
1 July 2015
CROSS Safety Report
Report ID: 431
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.