Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK [sub-heading only] (6)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (3)
- CROSS Safety Report (15)
- News [sub-heading only] (1)
CROSS regions
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Fatality from free standing wall collapse
A report was received from a local authority about a boundary wall to the front garden of a domestic property that collapsed suddenly resulting in the death of a child who was passing.
1 January 2008
CROSS Safety Report
Report ID: 59
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Collapse of blockwork retaining wall
An 18m length of a 29m long by 140mm thick 2m high dense concrete block retaining wall collapsed hours after being backfilled.
1 October 2009
CROSS Safety Report
Report ID: 162
Region: CROSS-UK
Masonry fall due to high wind
A five block high masonry wall collapsed during high winds.
1 January 2012
CROSS Safety Report
Report ID: 295
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Wall tie design between masonry panels and timber frames
This report discusses the potential for failure of timber frame wall ties between masonry and timber in moderate to high wind conditions.
1 January 2020
CROSS Safety Report
Report ID: 832
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Collapse of infill wall panel
A blockwork infill wall panel approximately 4m wide and 9m high between two building collapsed in high winds.
1 July 2015
CROSS Safety Report
Report ID: 511
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.