Safety information search results
Filter your results
Building or structure type
- Bridges (3)
- Buildings
(70)
- Car parks (1)
- Commercial (1)
- Education, science & art buildings (5)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (2)
- LPS buildings (2)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (30)
- Storage buildings (2)
- Tall buildings (2)
- Transport buildings (1)
- Freestanding walls (5)
- Railways (3)
- Retaining structures (24)
- Temporary structures (4)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (18)
- Assessment project [sub-heading only] (4)
- Construction project [sub-heading only] (50)
- Demolition project (3)
- Excavation (4)
- Extension project (8)
- New build (17)
- Refurbishment (5)
- Remediation project (5)
- Repair project (2)
- Structural assessment (5)
- Underpinning project (2)
Construction period
Method of construction
Elements & systems
- Arch (1)
- Balconies (1)
- Balustrades (1)
- Basements (4)
- Beams (8)
- Bracing (1)
- Cladding (4)
- Columns (4)
- Fasteners & connections (8)
- Fences (1)
- Fire protection (1)
- Foundations (5)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (3)
- Roofs (5)
- Shear walls (1)
- Slabs (8)
- Wall head restraints (3)
- (-) Walls (108)
- Wall ties (12)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (65)
- CROSS Newsletter (30)
- CROSS Safety Alert (2)
- CROSS Safety Report (106)
- News [sub-heading only] (10)
CROSS regions
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK
Failure to check designs produced by software
Concerns were raised about a proprietary design software after a building control officer noticed a regular error appearing while checking calculations provided to them.
1 January 2016
CROSS Safety Report
Report ID: 538
Region: CROSS-UK
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
Failure of cast-in lifting anchor on precast twin-wall
A precast reinforced concrete twin-wall panel was being lifted when one of the cast-in lifting anchors suffered a brittle failure.
1 January 2018
CROSS Safety Report
Report ID: 637
Region: CROSS-UK
Failure of cast-in lifting eye on L-shaped wall
During a routine lifting operation of a L-shaped wall unit, one of the legs on a cast-in lifting eye which was located on top of the unit pulled out of the concrete.
1 January 2018
CROSS Safety Report
Report ID: 638
Region: CROSS-UK
Wall collapse during house demolition
A reporter describes how poor demolition practice resulted in a wall falling onto a neighbouring property.
1 April 2017
CROSS Safety Report
Report ID: 608
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK