Safety information search results
Filter your results
Building or structure type
- Bridges (20)
- Buildings
(67)
- Car parks (10)
- Commercial (5)
- Education, science & art buildings (8)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (3)
- LPS buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (4)
- Residential (7)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (5)
- Buried pipes & culverts (3)
- Freestanding walls (3)
- Marine structures (1)
- Masts & towers (6)
- Offshore structures (1)
- Railways (8)
- Reservoirs & dams (1)
- Retaining structures (4)
- Roads (4)
- Temporary structures (3)
- Tunnels (1)
Building height
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (16)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (14)
- Extension project (1)
- Fire safety assessment (1)
- New build (3)
- Refurbishment (3)
- Remediation project (8)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (22)
Construction period
Method of construction
Structural form
Elements & systems
- Arch (3)
- Balconies (5)
- Balustrades (4)
- Basements (1)
- Beams (9)
- Bracing (3)
- Cables (1)
- Canopies (2)
- Ceilings (7)
- Cladding (10)
- Columns (5)
- Fasteners & connections (26)
- Fences (1)
- Fire protection (2)
- Foundations (5)
- Insulation (1)
- Lintels (1)
- Parapets (3)
- Roofs (20)
- Signs (2)
- Slabs (12)
- Tendons (1)
- Trusses (2)
- Walls (11)
- Wall ties (1)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (53)
- CROSS Newsletter (32)
- CROSS Safety Alert (8)
- CROSS Safety Report (101)
- CROSS Topic Paper (5)
- News [sub-heading only] (10)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Storm Barbara - loose and insecure parapet copings
A section of a roof parapet coping on a new school had been blown onto the roof of the school, having come loose from its fixing.
1 January 2018
CROSS Safety Report
Report ID: 636
Region: CROSS-UK
Concern about foundations to telecoms masts
Concerns are raised about a potential safety problem with the design and construction of ‘root’ foundations for telecom poles.
1 January 2018
CROSS Safety Report
Report ID: 690
Region: CROSS-UK
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Plasterwork ceiling partial collapse at railway station
A section of a ceiling cornice, plasterboard panel and lighting collapsed at a railway station landing on the floor.
1 October 2016
CROSS Safety Report
Report ID: 587
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Fall of material from bridge soffit
Several reports about materials falling from bridges have been sent by a bridge owner.
1 July 2016
CROSS Safety Report
Report ID: 549
Region: CROSS-UK