Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (5)
- CROSS Safety Report (12)
- News [sub-heading only] (3)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Incompetent design of simple steel beams
This report concerns designs for simple steel beams submitted to building control bodies under Part A of the Building Regulations. The reporter, a checking engineer for a building control body, was not able to accept the effective length and restraints assumed in a number of submitted designs. Most originated from individuals who used proprietary structural design computer packages without, i...
24 May 2023
CROSS Safety Report
Report ID: 1183
Region: CROSS-UK
Building regulations submissions
This report has been written on behalf of a group of senior local government structural engineers who refer to previous CROSS newsletters and in particular the reports relating to the poor quality of building regulation submissions and lack of checking resources.
1 July 2007
CROSS Safety Report
Report ID: 65
Region: CROSS-UK
Building control and the design of a free-standing wall
A reporter raises concerns over the design of a 2m high freestanding garden wall.
1 April 2011
CROSS Safety Report
Report ID: 163
Region: CROSS-UK
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Building control and budget limitations
A reporter is concerned that many local authorities do not seem to have the knowledge or impetus to address some technical issues even if the legislation is there for them as a course of action.
1 January 2015
CROSS Safety Report
Report ID: 389
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK