Safety information search results
Filter your results
Building or structure type
- Bridges (25)
- Buildings
(189)
- Agricultural buildings (8)
- Car parks (7)
- Commercial (16)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (10)
- Health care (2)
- Higher-risk buildings (4)
- Industrial buildings (4)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (7)
- Recreational buildings (6)
- Residential (50)
- Stadiums (1)
- Storage buildings (6)
- Tall buildings (11)
- Theatres & other entertainment buildings (4)
- Transport buildings (2)
- Buried pipes & culverts (2)
- Floating structures (1)
- Freestanding walls (2)
- Marine structures (2)
- Masts & towers (7)
- Offshore structures (1)
- Railways (4)
- Reservoirs & dams (2)
- Retaining structures (14)
- Roads (5)
- Sewers (2)
- Temporary structures (14)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (4)
- Computational design (11)
- Design: quality management (60)
- Design calculations (67)
- Design conceptualisation (25)
- Design detailing (74)
- Design drawings (25)
- Design loads (70)
- Design software (30)
- Dynamics (5)
- Fire safety design (12)
- Resilience (14)
- Robustness (37)
- Structural design (91)
- Sustainability (6)
Fire incident response
Project type
- Alteration & conversion project (20)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (2)
- Construction project [sub-heading only] (96)
- Demolition project (1)
- Excavation (5)
- Extension project (13)
- Groundworks project (1)
- Maintenance project (2)
- New build (43)
- Refurbishment (14)
- Remediation project (11)
- Repair project (6)
- Strengthening project (3)
- Structural assessment (15)
- Underpinning project (2)
Construction period
Method of construction
Elements & systems
- Arch (2)
- Balconies (4)
- Balustrades (9)
- Basements (7)
- Beams (42)
- Bracing (12)
- Cables (1)
- Canopies (1)
- Ceilings (8)
- Cladding (20)
- Columns (23)
- Fasteners & connections (67)
- Fences (1)
- Fire protection (9)
- Foundations (16)
- Insulation (8)
- Light gauge steel framing (3)
- Padstones (2)
- Parapets (3)
- PV panels (2)
- Roofs (39)
- Sandwich panels (2)
- Shear walls (2)
- Signs (1)
- Slabs (22)
- Trusses (6)
- Walls (37)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-UK [sub-heading only]
(29)
- Building Control Northern Ireland (2)
- Building Safety Regulator (BSR) (1)
- Environment Agency (1)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (8)
- Local Authority Building Control (LABC) (12)
- Local Authority Building Standards Scotland (LABSS) (2)
- Scottish Environment Protection Agency (SEPA) (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (5)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (6)
- CROSS-UK Newsletter 57 (5)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (7)
- CROSS-UK Newsletter 64 (4)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (161)
- CROSS Feature Article (1)
- CROSS Newsletter (99)
- CROSS Safety Alert (7)
- CROSS Safety Report (270)
- CROSS Topic Paper (8)
- News [sub-heading only] (38)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
- Third party content (4)
- Third party content (2)
CROSS regions
Building control and budget limitations
A reporter is concerned that many local authorities do not seem to have the knowledge or impetus to address some technical issues even if the legislation is there for them as a course of action.
1 January 2015
CROSS Safety Report
Report ID: 389
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Fixings related to 395 partial roof collapse at shopping centre
A reporter shares their own experience and concerns after reading report 395 which discussed the partial roof collapse at a shopping centre.
1 January 2015
CROSS Safety Report
Report ID: 422
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Partial roof collapse at shopping centre
There was a recent partial roof collapse at a shopping centre which was, says the reporter, built in the early 1970s in a form which may have been used extensively throughout the UK during this period and possibly beyond.
1 October 2013
CROSS Safety Report
Report ID: 395
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Application of wind load code BS EN 1991 - wind actions
A reporter's concern is about the application of the wind load code BS EN 1991-1-4: 2005 Eurocode 1: Actions on structures - Part 1-4.
1 October 2014
CROSS Safety Report
Report ID: 403
Region: CROSS-UK
Quick and cheap design calculations
A reporter raises concerns about poor design calculation being provided through a website at a very low price.
1 January 2014
CROSS Safety Report
Report ID: 411
Region: CROSS-UK
Snow sliding off industrial building roofs
A lean-to roof at lower level than the main roof of a large industrial building collapsed and ground level equipment was damaged due to a sliding snow.
1 October 2014
CROSS Safety Report
Report ID: 438
Region: CROSS-UK
Computer analysis and slab design twisting moments
A reporter has noticed on many occasions when checking reinforced concrete and post-tensioned slab designs that engineers often neglect to consider twisting moments when arriving at slab design moments.
1 October 2014
CROSS Safety Report
Report ID: 441
Region: CROSS-UK