Safety information search results
Filter your results
Building or structure type
- Bridges (4)
- Buildings
(27)
- Commercial (1)
- Education, science & art buildings (4)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (2)
- Residential (4)
- Stadiums (1)
- Tall buildings (3)
- Theatres & other entertainment buildings (1)
- Transport buildings (2)
- Floating structures (1)
- Freestanding walls (2)
- Marine structures (1)
- Masts & towers (1)
- Railways (1)
- Retaining structures (2)
- Roads (1)
- Temporary structures (2)
Building height
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (3)
- Assessment project [sub-heading only] (20)
- Conservation & restoration project (2)
- Construction project [sub-heading only] (7)
- Fire safety assessment (2)
- New build (2)
- Refurbishment (3)
- Remediation project (4)
- Repair project (2)
- Strengthening project (1)
- (-) Structural assessment (30)
Construction period
Method of construction
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (10)
- CROSS Safety Report (29)
- CROSS Topic Paper (1)
CROSS regions
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Structures at the end of their design life
Design life varies according to the type and use of a structure. A structure should retain fitness for purpose as it approaches and passes its design life or changes use.
1 June 2015
CROSS Topic Paper
Region: CROSS-UK
Flaws with partial encasements around steel columns
A structural assessment found that steel columns encased in concrete to mid-storey height were heavily corroded directly above the top of the encasements.
1 January 2016
CROSS Safety Report
Report ID: 517
Region: CROSS-UK
PV panels blown off roof
Concerns are raised about the adequacy of fixings for PV panels after panels were blown off of a flat roof.
1 October 2015
CROSS Safety Report
Report ID: 519
Region: CROSS-UK
PV panels on domestic roof
A reporter raises concerns as they suspect PV panels are being erected on domestic (and commercial) roofs across the UK without adequate engineering analysis and design.
1 October 2015
CROSS Safety Report
Report ID: 528
Region: CROSS-UK