Safety information search results
Filter your results
Building or structure type
- Bridges (9)
- Buildings
(82)
- Car parks (3)
- Commercial (5)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (27)
- Stadiums (2)
- Storage buildings (2)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Masts & towers (3)
- Railways (4)
- Retaining structures (3)
- Roads (2)
- Sewers (1)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (95)
- Extension project (1)
- (-) New build (106)
- Refurbishment (6)
- Remediation project (6)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (2)
Method of construction
Elements & systems
- Arch (1)
- Balconies (4)
- Balustrades (3)
- Basements (1)
- Beams (28)
- Bracing (7)
- Canopies (1)
- Cladding (6)
- Columns (19)
- Fasteners & connections (26)
- Fire protection (5)
- Foundations (13)
- Insulation (2)
- Light gauge steel framing (2)
- Lintels (2)
- Padstones (2)
- Roofs (5)
- Signs (1)
- Slabs (19)
- Tendons (1)
- Trusses (1)
- Wall head restraints (1)
- Walls (17)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (70)
- CROSS Newsletter (58)
- CROSS Safety Report (106)
- News [sub-heading only] (18)
CROSS regions
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Spalled concrete falls from rear face of drilled hole 26 floors up
A reporter describes how during drilling, an operator over drilled the hole causing spalling on the back face of the concrete.
1 July 2017
CROSS Safety Report
Report ID: 639
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK
Steel canopy collapse during building completion works
During the construction of a new school, a long span steel truss failed, resulting in the collapse of a canopy.
1 July 2017
CROSS Safety Report
Report ID: 664
Region: CROSS-UK
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Architect conducts structural design of sway frame for domestic project
A reporter looked at a project recently where the drawings had been produced by the architect, including a structural design.
1 April 2018
CROSS Safety Report
Report ID: 678
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK