Safety information search results
Filter your results
Building or structure type
- Bridges (9)
- Buildings
(87)
- Car parks (3)
- Commercial (5)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (27)
- Stadiums (2)
- Storage buildings (4)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Masts & towers (4)
- Railways (4)
- Retaining structures (3)
- Roads (2)
- Sewers (1)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (104)
- Extension project (1)
- (-) New build (119)
- Refurbishment (6)
- Remediation project (6)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (2)
Method of construction
Elements & systems
- Arch (1)
- Balconies (4)
- Balustrades (3)
- Basements (1)
- Beams (30)
- Bracing (7)
- Canopies (1)
- Ceilings (1)
- Cladding (7)
- Columns (22)
- Fasteners & connections (30)
- Fire protection (5)
- Foundations (15)
- Insulation (2)
- Light gauge steel framing (4)
- Lintels (2)
- Padstones (2)
- Parapets (1)
- Roofs (6)
- Signs (1)
- Slabs (21)
- Tendons (1)
- Trusses (1)
- Wall head restraints (1)
- Walls (19)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 4 (4)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (70)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (4)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (58)
- CROSS Safety Report (119)
- News [sub-heading only] (18)
CROSS regions
Building Regulations submission for a small house
A reporter who is a small builder shares their experience on inadequate design calculations they received for a small house.
1 January 2008
CROSS Safety Report
Report ID: 91
Region: CROSS-UK
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Safety issues with composite metal deck floors
A contractor had a near miss when pouring a concrete slab with permanent formwork.
1 January 2012
CROSS Safety Report
Report ID: 288
Region: CROSS-UK
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
1 October 2011
CROSS Safety Report
Report ID: 257
Region: CROSS-UK
Collapse of a hollow core unit
This refers to the collapse of one modest span precast hollow core concrete unit and the excessive deflection of others on a building which was under construction.
1 October 2012
CROSS Safety Report
Report ID: 258
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Falsework collapse during slab pour in SE Asia
There was a partial collapse of falsework on a project in Southeast Asia.
1 July 2013
CROSS Safety Report
Report ID: 337
Region: CROSS-UK