Safety information search results
Filter your results
Building or structure type
- Bridges (3)
- Buildings
(44)
- Agricultural buildings (4)
- Car parks (1)
- Commercial (5)
- Education, science & art buildings (2)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (2)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (1)
- Residential (13)
- Stadiums (1)
- Storage buildings (5)
- Tall buildings (3)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Masts & towers (3)
- Railways (1)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 23 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (12)
- CROSS Safety Alert (1)
- CROSS Safety Report (47)
- News [sub-heading only] (4)
CROSS regions
Overloading a portal frame with suspended services
A reporter designing a single storey portal frame used a standard roof service loading of 0.25kN/m2. After the project was completed, a tenant for the unit took over fit out and added a considerable amount of sprinkler pipework into the roof. This created local overloading.
21 August 2023
CROSS Safety Report
Report ID: 1195
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Structural misunderstanding leads to historic church tower nearly being demolished
A historic church stands at the center of a charming town. Highlighted among many striking features is the iconic 170-foot (52m) bell tower, which looms over the town. For decades, the tower has become the centerpiece for cultural events in addition to being the original community center of worship.
2 May 2023
CROSS Safety Report
Report ID: 1013
Region: CROSS-US
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Vertical cross bracing unbolted on-site
A reporter came across a situation where a vertical cross bracing member of a temporary steel frame structure had been unbolted on-site.
10 February 2023
CROSS Safety Report
Report ID: 861
Region: CROSS-UK
Temporary instability of columns
Concerns were raised by a reporter on the temporary stability of concrete columns during construction.
2 February 2023
CROSS Safety Report
Report ID: 872
Region: CROSS-UK
Collapse of external brick wall during demolition works
A section of an external brick wall of a building collapsed suddenly and unexpectedly part way through a demolition contract.
13 December 2022
CROSS Safety Report
Report ID: 875
Region: CROSS-UK
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.