Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (14)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (70)
- Demolition project (5)
- Excavation (16)
- Extension project (4)
- Groundworks project (3)
- New build (23)
- Refurbishment (4)
- Strengthening project (1)
- Structural assessment (3)
- Underpinning project (3)
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 21 (2)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (4)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (77)
- CROSS Newsletter (47)
- CROSS Safety Alert (1)
- CROSS Safety Report (121)
- CROSS Topic Paper (4)
- News [sub-heading only] (14)
- Safety information from CROSS [sub-heading only] (1)
- Third party content (1)
- Third party report (1)
CROSS regions
Risks from off-site manufacture and hybrid construction
A reporter was recently investigating a ‘near miss’ involving concrete construction in which pre-cast and in-situ concrete were used in combination.
1 January 2016
CROSS Safety Report
Report ID: 529
Region: CROSS-UK
Failure of existing basement wall
A basement retaining wall failed when a new basement was formed by excavating 1.8m.
1 July 2014
CROSS Safety Report
Report ID: 385
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Temporary works design for basements
A reporter had an inquiry from a contractor who, after appointment, discovered that there was a serious lack of temporary works design information provided.
1 July 2015
CROSS Safety Report
Report ID: 423
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK
Unstable site hoarding on unattended site
The reporter is aware of unsafe hoarding that surrounds a partially developed site that has been left unattended following the economic downturn.
1 January 2014
CROSS Safety Report
Report ID: 413
Region: CROSS-UK
Cost of design standard for scaffolding
The reporter is concerned that designers will not use the design standard for access scaffolding due to its high price.
1 October 2015
CROSS Safety Report
Report ID: 445
Region: CROSS-UK