Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (9)
- CROSS Safety Report (18)
- News [sub-heading only] (1)
CROSS regions
Architectural panel acting as barrier
A reporter came across a scenario on site where an architectural decorative panel was acting as a barrier during the construction stage without being designed to act as one.
6 April 2023
CROSS Safety Report
Report ID: 927
Region: CROSS-UK
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Near miss when modifying brickwork
A reporter’s experience of creating a new door opening in an existing brick wall on the first floor of an old building is not always as simple as it would appear.
1 February 2020
CROSS Safety Report
Report ID: 847
Region: CROSS-AUS
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Worker trapped in excavation
An operative received serious injuries when the excavation they were working in collapsed.
1 July 2016
CROSS Safety Report
Report ID: 576
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.