Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (3)
- CROSS Newsletter (2)
- CROSS Safety Report (7)
- News [sub-heading only] (1)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Design of timber structures
An approximate design led to a timber roof deflecting considerably.
1 November 2005
CROSS Safety Report
Report ID: 17
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK
Roof collapse at primary school
Blocked drainage outlets likely lead to the build-up of water on a school roof which collapsed.
1 July 2020
CROSS Safety Report
Report ID: 958
Region: CROSS-UK
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Inadequate design of cantilever glass barriers
A reporter has observed a growing number of cases where cantilever glass balustrades in public buildings are, in their view, inadequately designed.
1 April 2018
CROSS Safety Report
Report ID: 735
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.