Safety information search results
Filter your results
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (16)
- Extension project (4)
- Fire safety assessment (1)
- Maintenance project (1)
- New build (9)
- Refurbishment (2)
- Remediation project (4)
- Strengthening project (1)
- Structural assessment (1)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (17)
- CROSS Newsletter (16)
- CROSS Safety Report (64)
- News [sub-heading only] (4)
CROSS regions
Risk in notching timber studs
During the construction of a block of apartments a reporter found a couple of locations on an external fourth floor wall where the load-bearing studs had been notched well past permissible depths.
1 January 2011
CROSS Safety Report
Report ID: 209
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Metal cladding panels blowing in the wind
A local authority was called to investigate a dangerous structure where metal cladding panels on the 10th floor of a student accommodation block were flapping in high winds.
1 January 2015
CROSS Safety Report
Report ID: 461
Region: CROSS-UK
Balcony construction defects of residential flats
A reporter's firm have been undertaking structural assessments of cantilevered reinforced concrete walkways, which in the majority of cases have been found to be under strength.
1 April 2014
CROSS Safety Report
Report ID: 435
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Suspended ceiling replacement in high rise block
A reporter was involved in replacing a suspended ceiling after a few loose panels had fallen, resulting in a minor injury in one case.
1 April 2020
CROSS Safety Report
Report ID: 911
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK