Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS Newsletter (6)
- CROSS Safety Report (11)
- News [sub-heading only] (3)
CROSS regions
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Structural issues with cladding
A reporter who investigates cladding failures shares common issues they have encountered.
1 April 2020
CROSS Safety Report
Report ID: 904
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.