Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (5)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (2)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Rigid wall flexible diaphragm roof collapse in earthquake
Part of the roof of a one-story building in California collapsed during a 2019 earthquake.
1 March 2020
CROSS Safety Report
Report ID: 877
Region: CROSS-US
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Retaining wall concerns and the stance of a local authority
A reporter was asked by a client to assess a retaining wall built on their boundary by a neighbour who had erected a new dwelling. A review of the calculations and a typical section gave serious concern for its strength.
1 July 2010
CROSS Safety Report
Report ID: 189
Region: CROSS-UK
Collapse of blockwork retaining wall
An 18m length of a 29m long by 140mm thick 2m high dense concrete block retaining wall collapsed hours after being backfilled.
1 October 2009
CROSS Safety Report
Report ID: 162
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.