Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (7)
- CROSS Safety Alert (2)
- CROSS Safety Report (26)
- News [sub-heading only] (2)
CROSS regions
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Incorrectly fixed sheets blow off parapet
This report concerns aluminium coping sheets that blew off the parapet of a block of flats under construction. The reporter says a fierce wind blew off several sheets which fell to the ground about 9m below. A building and a car were damaged but thankfully no one was hurt, although the potential for personal injury or death was significant.
25 May 2023
CROSS Safety Report
Report ID: 1180
Region: CROSS-UK
Photovoltaic installations - structural aspects
CROSS has concerns about some structural aspects of roof mounted PV and solar thermal panels.
1 November 2016
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Inquiry into the construction of Edinburgh Schools
This Alert deals with the aftermath of the collapse of part the outer skin of a cavity wall at Oxgangs Primary School Edinburgh on 29th January 2016 in high winds.
1 February 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Wind damage to gable wall
Following request for examples of wind damage this collapse was reported of the external brick skin of gable wall of a two storey timber frame terraced house.
1 April 2007
CROSS Safety Report
Report ID: 78
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Site hoardings blow down
Investigations into timber hoarding failures by the reporter’s firm indicated that the majority of site hoardings are erected with no design whatsoever.
1 October 2007
CROSS Safety Report
Report ID: 83
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.