Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (12)
- (-) CROSS Safety Report (25)
- News [sub-heading only] (2)
CROSS regions
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Dislodged finger plate on highway bridge
A correspondent received a report about a 1.5m long section of a steel finger plate expansion joint on a highway bridge that had been inadequately fixed and became dislodged.
1 February 2020
CROSS Safety Report
Report ID: 879
Region: CROSS-AUS
Sliding glass door - two-part subhead failure
Called to inspect the failure of a glazed sliding door system a correspondent noted that the system comprised a two-part subhead, which includes a removable bead that relies on a bearing of only a few millimetres.
1 February 2020
CROSS Safety Report
Report ID: 818
Region: CROSS-AUS
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Submit a report