Safety information search results
Filter your results
Project or lifecycle stage
Operation or occupation
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (12)
- CROSS Safety Report (24)
- News [sub-heading only] (2)
CROSS regions
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Insufficient attention to the construction of tower crane bases
While working on construction sites a reporter was involved with tower crane bases supported on piles with pile caps and pedestals with cast-in anchors that had significant construction defects.
1 August 2020
CROSS Safety Report
Report ID: 920
Region: CROSS-AUS
Overloading metal decking in temporary state
During construction of steel structures with composite metal decking floors, a reporter has observed numerous occasions when the metal decking was close to being overloaded.
1 August 2020
CROSS Safety Report
Report ID: 919
Region: CROSS-AUS
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK
Shutter failure during concrete wall pour
A reporter describes how a shutter failed during a concrete wall pour due to resin fixed ties not being allowed to cure.
1 April 2019
CROSS Safety Report
Report ID: 766
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.