CROSS regions
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Failure of blind bolts
There was a partial collapse of a steel frame building due to the failure of some blind bolts during the construction period. Loads at the time were well below anticipated failure levels.
1 April 2007
CROSS Safety Report
Report ID: 71
Region: CROSS-UK
Steel portal frame erection
A reporter describes how a steel portal frame collapsed during its erection.
1 March 2006
CROSS Safety Report
Report ID: 20
Region: CROSS-UK
Mandatory seismic retrofit construction with quality control problems
Standard seismic retrofit details were used for a building with a non-standard foundation, resulting in inadequate connection of structural shear walls to foundations.
1 September 2020
CROSS Safety Report
Report ID: 888
Region: CROSS-US
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.