Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
- Balustrades (1)
- Beams (11)
- Bracing (4)
- Cables (1)
- Ceilings (13)
- Cladding (15)
- Columns (6)
- (-) Fasteners & connections (86)
- Fire protection (1)
- Foundations (10)
- Insulation (1)
- Parapets (1)
- Roofs (4)
- Sandwich panels (1)
- Shear walls (2)
- Signs (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (6)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (47)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (25)
- CROSS Safety Report (86)
- News [sub-heading only] (12)
CROSS regions
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Cladding failure in strong winds
A reporter writes with concerns about a repeat failure of building cladding, in severe but not exceptional winds, that saw panels fall to the public street below.
17 February 2023
CROSS Safety Report
Report ID: 1172
Region: CROSS-UK
Incorrectly fixed sheets blow off parapet
This report concerns aluminium coping sheets that blew off the parapet of a block of flats under construction. The reporter says a fierce wind blew off several sheets which fell to the ground about 9m below. A building and a car were damaged but thankfully no one was hurt, although the potential for personal injury or death was significant.
25 May 2023
CROSS Safety Report
Report ID: 1180
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Inadequate bridge bearing pad installation
During the final construction phase of a reinforced concrete bridge deck, the contractor installed the elastomeric bridge bearing pads using a non-approved and potentially dangerous methodology.
28 March 2023
CROSS Safety Report
Report ID: 828
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.