Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Installation of epoxy resin adhesive for reinforcing bar anchors
Potentially dangerous installation of resin-anchored reinforcing bars, where epoxy resin was applied at the top of the hole after bars had been inserted.
7 November 2023
CROSS Safety Report
Report ID: 1225
Region: CROSS-AUS
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Safety concern about the design of thin concrete walls
The reporter raises their concern about the design of thin concrete load-bearing walls, sometimes supporting 10 or more storeys.
1 July 2019
CROSS Safety Report
Report ID: 815
Region: CROSS-AUS
Insufficient attention to the construction of tower crane bases
While working on construction sites a reporter was involved with tower crane bases supported on piles with pile caps and pedestals with cast-in anchors that had significant construction defects.
1 August 2020
CROSS Safety Report
Report ID: 920
Region: CROSS-AUS
Overloading metal decking in temporary state
During construction of steel structures with composite metal decking floors, a reporter has observed numerous occasions when the metal decking was close to being overloaded.
1 August 2020
CROSS Safety Report
Report ID: 919
Region: CROSS-AUS
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS