Safety information search results
Filter your results
Safety area
Building or structure type
Materials
Project or lifecycle stage
Design
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (10)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (1)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (1)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (1)
- CROSS Safety Report (47)
- Safety information [sub-heading only] (1)
CROSS regions
No worse than existing?
This report discusses the perceived exploitation of a common fire safety argument: the existing condition.
17 February 2023
CROSS Safety Report
Report ID: 1148
Region: CROSS-UK
The potential for expertise asymmetry in aspects of the design of tall buildings in the UK
A reporter is concerned about the potential for 'expertise asymmetry' in the fire safety domain, with a focus on smoke control systems.
20 February 2023
CROSS Safety Report
Report ID: 1143
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Fire safety concerns for partially occupied Higher Risk Residential Buildings
Fire authority checks found several safety failings in partially occupied Higher Risk Residential Buildings.
24 May 2023
CROSS Safety Report
Report ID: 1169
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US
Design of internal partitions for horizontal loads
This report draws attention to the requirement for internal partitions to be designed for horizontal loads from wind and seismic effects in accordance with Section B of the Australian National Construction Code (NCC).
30 April 2021
CROSS Safety Report
Report ID: 1000
Region: CROSS-AUS
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Fire safety management during building works
A reporter shares multiple and various concerns about the maintenance of existing fire safety measures during a period of building work, as well as the approach taken to manage building evacuation for persons with reduced mobility (PRM).
21 August 2023
CROSS Safety Report
Report ID: 1193
Region: CROSS-UK